Cold Storage Solutions for Latin America
From Mexico to Argentina — manufacturer-direct cold rooms, freezer rooms, and blast freezers for exporters, processors, and distributors across Latin America.
Countries we serve
Why Cook Cold Storage
Manufacturer-direct pricing
Factory prices without regional middlemen — the same quality as US-made units at a fraction of the cost.
Export-ready engineering
CE and ISO-certified builds, tropical-climate refrigeration, and voltage options for every country (220V/380V/440V).
Spanish & Portuguese support
Spanish-speaking engineers from quote to commissioning, plus Portuguese-language documentation for Brazil.
Proven regional projects
Reference installations across Peru, Chile, Mexico, and the Caribbean — from seafood to produce to pharmaceutical.
Logistics & delivery
- ✓ Regular sailings to Callao, Valparaíso, Buenaventura, Manzanillo, and Santos
- ✓ Panels ship flat-packed in containers — freight savings of 30–50% vs assembled units
- ✓ Customs support: packing list, invoice, certificate of origin in Spanish
- ✓ Typical transit: 3–5 weeks to West Coast South America, 4–6 weeks to East Coast
Frequently Asked Questions
How do you compare with local Latin American manufacturers? +
We combine China factory-direct pricing with export-grade engineering. Most buyers find our delivered cost 20–40% below regional brands with equal or better specifications.
Do you ship to Brazil? +
Yes — we ship to Santos and other Brazilian ports with Portuguese-language documentation. Note that Brazil requires a local customs broker, which we coordinate.
What voltage do you supply for Latin America? +
We supply 220V, 380V, and 440V — plus 60Hz or 50Hz as your country requires. Confirm your local standard at quote time.
Is installation support available? +
Yes — Spanish-speaking engineers provide remote commissioning support, and we can dispatch a technician for larger projects in the region.
Ready to build your cold storage project?
Tell us your size, temperature, and application. We reply with a custom proposal within 48 hours.